Correct Answer - Option 1 : 150 ns has to be inserted into the y-channel
The slope level detector circuit’s delay = 100 ns
The start-stop sweep generator response time = 50 ns
Total delay = 100 ns + 50 ns = 150 ns.
Sweep generator is applied across horizontal plate and unknown input is applied across vertical plate.
Hence to display correctly, a delay line of 150 ns has to be inserted into vertical plate (or) y-channel