The correct sequence of load transfer in case of a bridge is:
1. Floor beams > Joints > Stringers
2. Stringers > Floor beams > Joints
3. Stringers > Joints > Floor beams
4. Floor beams > Stringers > Joints

1 Answer

0 votes
by (240k points)
selected by
 
Best answer
Correct Answer - Option 2 : Stringers > Floor beams > Joints

Explanation:

Load transfer in bridge: The bridge is designed in a way that the sequence of load transfer is Stringers then Floor beams and then Joints, because beams are strongest and to transfer load to the beams, stringers are used. Joints are the weakest, hence load is transferred to joints at last.

Hence, the correct sequence is Stringers > Floor beams > Joints

Welcome to Sarthaks eConnect: A unique platform where students can interact with teachers/experts/students to get solutions to their queries. Students (upto class 10+2) preparing for All Government Exams, CBSE Board Exam, ICSE Board Exam, State Board Exam, JEE (Mains+Advance) and NEET can ask questions from any subject and get quick answers by subject teachers/ experts/mentors/students.