A single-phase 100 KVA generator supplies power to an 80 kW load at 0.8 power factor lagging. An additional load of 15 kW and 90% power factor lagging is to be added to the generator. Determine the size (reactive power) of capacitor bank so that when it is connected to the load the generator will supply power to the loads while operating at rated power kVA.