This project is adopted into two different phases:
Phase First: Construction of dis – tributaries of length 345 km for irrigation of 5.53 lakh hectare area.
Phase Second: Construction of the main canal of length 256 km and the dis-tributaries of length 5112 km for irrigation of 19.63 lakh hectare area.