Correct Answer - Option 1 : 28 days
Given:
A and B both together can complete the work in 16 days
Concept:
Work = Efficiency × Time
Calculation:
Let us assume the efficiency of A and B is 4x and 3x respectively.
⇒ Total work = 16 × 7x = 112x
⇒ A can complete the work in = 112x/4x = 28 days
∴ The required result will be 28 days.