Correct Answer - Option 1 : 50 days
Concept used:
(M1 × D1 × H1)/W1 = (M2 × D2 × H2)/W2
M → Number of men, D → Day and H → Hour, W → Wage
Calculation:
(50 × 60)/300 = ((50 - 10) × D)/200
⇒ D = (50 × 60 × 2)/(3 × 40) = 50
∴ The required number of days is 50